The full ECML covers 393 miles (632km) from London King’s Cross to Edinburgh, passing through Peterborough, Doncaster, York, Darlington and Newcastle. It forms a key artery on the eastern side of the UK and broadly runs parallel to the A1 trunk road. Classed as a high speed line, as it mostly meets the speed criteria of 125mph (201km/h), the route handles cross-country, commuter and local passenger services, and is a primary route for heavy tonnage of freight traffic between the north and south of the UK. Electrification of the route was authorised in 1984 and work began in 1985. The first electrified section between London and Leeds opened for operational trials in 1988, and was the fastest main line in the UK until the opening of High Speed 1 in 2003. The route for Train Simulator takes in the 76 mile (122 km) section of the ECML from London to Peterborough. Starting out at the busy London King’s Cross station, a large hub for long distance and outer-suburban services, the route wind...
развернуть